There is a gap in the information available during the next period but in 2005/6 more work was carried out to remove the now unused school kitchen and replace it with a new staff room. The previous staff room became the school office, the old school office became the Headteacher's room and the previous Headteacher's room became the pupils' teaching kitchen.
In 2007 a new reception classroom was built and classrooms 1 and 2 were extended.
The requirement for a new reception classroom had been stated in a previous Ofsted inspection report and in 2008 a new Ofsted inspection graded the school as OUTSTANDING.
Since then, the school has added a second ICT room, an all-weather sports pitch and some additional rooms for small-group teaching.
A full inspection by Ofsted was in November 2013 when the school was graded GOOD in all areas.
Following a government requirement that schools provide school meals to their infant pupils, a new school kitchen was installed in 2014.
|